MedhavynmedhavynBook a demo
etavat/QMS
M-02 · LIFECYCLE

QMS

Integrated quality management system.

NCR-0193closed · CAPA verified DRAWINGHSG-2210 · rev C INSPECTION8 chars · 7 pass / 1 fail VisionQ1,204 images · CAM-01 SHIPMENTASN-5531 · released MACHINEVMC-07 · fixture F-12 OPERATORshift B · signed off LOT 24-118HSG-2210 · 240 pcs ✓ AUDIT-READY · 7 LINKS
QMS · LOT 24-118 · RECORD TRACE
The problem

Quality records live in spreadsheets and silos.

Control plans sit in one file, results in another, and approvals in email. APQP and PPAP packages are assembled by hand, and measurement studies are kept apart from the parts they relate to. Without one connected system, every audit, traceability request and corrective action starts from scratch, and the same deviation can be found, fixed and repeated without the lesson ever reaching design.

How it works

Three steps. Zero guesswork.

01
PlanDefine control plans from DrawingQ specs.
02
RecordCapture results from the line and VisionQ automatically.
03
ActTrace deviations, run corrective action, feed back to design.
Process control

Catch drift before it becomes a defect.

Every measurement is charted as it arrives. QMS spots trends inside the limits and flags them while they are still cheap to fix.

USL 340.20UCL340.00LCLLSL 339.80 TREND · 6 rising points · char 01 · 340 ±0.2flagged before limit · NCR not needed · tool offset scheduled CMM-02 · LOT 24-118 · X̄ chart
NPD

From RFQ to manufacturing handover.

Three structured phases organize enquiry, feasibility, planning and product development.

Phase 01RFQRequest for Quotation
  • Enquiry Form
  • APQP Matrix
  • Team Feasibility
  • Quotation
Phase 02Planning & DefinitionPlan the work
  • APQP Time Plan
  • Risk Analysis
  • Resource Requirements
  • Acceptance Note
Phase 03Product Design & DevelopmentPrepare for manufacturing
  • MFG Process Design Form
  • Tool Buyoff Form
  • Part Handover Note
PPAP

Organize the product approval package.

A structured collection of process planning, verification, submission and change records.

01Process Planning
  • Process Flow Chart (PFC)
  • PFMEA
  • Control Plan
  • FQP
  • Incoming Material Control Plan (IMCP)
02Product Verification
  • Drawing Evaluation Form
  • Material Test
  • Part Appearance Approval Form
03Submission & Changes
  • Part Submission Warrant (PSW)
  • Supplier Details
  • Engineering Change Note
MSA

Evaluate measurement system consistency.

etavat includes workflows for Variable and Attribute Gauge R&R studies.

Variable GR&R

Evaluates variation in numerical measurements across appraisers and repeated trials.

Example: shaft diameter measured with a micrometer.

Illustrative · measured values across repeated trials24.925.025.125.20123456789Inspector AInspector BInspector CTrialMeasured value (mm)
Attribute GR&R

Evaluates consistency when parts are classified into categories such as pass/fail.

Example: multiple inspectors assess the same parts.

Illustrative · attribute agreement0%25%50%75%100%Inspector A92%Inspector B84%Inspector C88%Agreement with reference (%)Inspector
Also in etavat · M-01DrawingQ Accelerated productivity, automated by AI.Also in etavat · M-03Asset Intelligence Organize the resources behind manufacturing.Also in etavat · M-04VisionQ Train for the part. Inspect with consistency. Track every result.